Skip to content
Commercial · Industrial · Tenant improvement · Tempe, AZ

Electrical that passes inspection the first time and turns over on the date.

Thirty-four electricians, our own crew, no subs. Tenant improvements, 400A to 4000A service upgrades, data and low-voltage, controls and lighting retrofits for GCs and property managers across the East Valley.

ROC 298114 CR-11 · Bonded to $5M · EMR 0.79 · Since 2011

Voltline electrician terminating conductors in a commercial panelboard
Ray Delgado at a 1200A switchgear install, Chandler
02 — Why us

What a GC actually gets from us.

Not promises. Habits, and the paperwork to prove them.

Rough-in inspections pass first time

97% first-pass on rough and final over the last three years, tracked per job. The 3% are documented with what we changed.

Submittals in five working days

Gear, fixtures, and panel schedules submitted within five days of award, with lead times flagged so the schedule is honest early.

A foreman who reads the whole set

Every foreman carries the architectural and mechanical sheets, not just the E-series. Conflicts get caught at layout, not at drywall.

As-builts the week we turn over

Redlines go to CAD as we go. Owners get a marked set and panel directories the week of final, not a month later.

97%first-pass inspection rate, rough and final, 2023–2025
34electricians on payroll; no labor subs on our scope
0.79experience modification rate, three years under 0.85
412commercial projects turned over since 2011
05 — What clients say

In their words.

“Submittals in a week, rough passed first time, and the foreman caught a duct conflict before we framed around it. That is the whole list.”

J. Hadley, Superintendent, Layton Construction

“They managed the SRP case so I did not have to. Changeover was five and a half hours and nobody in the building noticed.”

M. Chen, Owner, Price Corridor office building

“Every cable labeled, every link certified, reports in a folder. The first low-voltage job I have not had to redo part of.”

D. Okafor, IT Director, avionics manufacturer
Next step

Send us the drawings. We will tell you what it costs and when it is done.

Ray or a project manager replies the same business day with a date for the number.

Demonstration site. Voltline Electric is a fictional company. Designed and built by Ironsite Digital to show what a commercial electrical contractor's website should be. Want one like it?